How does a Lift traffic analysis work, what does it measure (waiting time, handling capacity), when to do it, and why getting it wrong is so costly to fix or is unable to be fixed.

How many Lifts does an office building need? It depends on the floors, population, building floor use (cafes, end of trip facilities etc) and standard of service. A traffic analysis gives the answer for each building type based on specific data and set of variables.
Want an independent view of your own lifts?
Talk to a consultantThe number, size and speed of a building's Lifts are fixed early in design and are almost impossible to change later. If they are wrong, the building is left with long queues, crowded cars and unhappy tenants. Lift traffic analysis is how the right answer is found.
Liftwells take floor space on every level, so developers want as few as possible. But with too few Lifts the building fails its occupants at every peak, and with too many it loses lettable space. The Lift core is one of the few things a building cannot revisit later.
LML uses recognised design guidance, including CIBSE Guide D, together with simulation software. The Property Council of Australia's office grades ask the lifts to move 12 to 14 per cent of the building's population in a five-minute up-peak, with average waiting times of 25 seconds (Premium) to 35 seconds (Grade B).

LML uses Elevate simulation software to model how each option performs.
Three mistakes to avoid are underestimating the building's population, ignoring lunchtime peaks, and choosing Lift sizes on cost rather than traffic.
Traffic analysis is also useful in existing buildings. Before a modernisation, it tests whether faster Lifts, quicker door times, changes in acceleration and deceleration rates, destination control or a different group arrangement would improve service without adding Lifts. See Destination control: is it right for your building?
Traffic analysis costs least and does the most good at concept design, before the structure and core are locked in.
Where a new Lift is being added to an existing building (if possible), LML prepares a pre-design report after a site inspection. It sets out the type of Lift that suits the building, with options for car size, liftwell size, pit depth, overrun height, speed, safety and compliance, the user interface and accessibility needs.
A good report is short and lets you compare the options. It should cover:
If a report gives only one option, ask what else was tested.
Buildings designed without a proper traffic analysis tend to fail in the same ways:
Fixing any of these after the building is finished is expensive, and sometimes impossible, because the number and size of the liftwells can't easily change.
The results depend on the information the analysis starts with:
A building converted from offices to apartments, or with a new anchor tenant, may need its lift arrangements checked again.
It depends on the floors, population and standard of service. A traffic analysis gives the answer for a specific building.
As a guide, an average wait of 25 to 30 seconds is good for an office and under 40 seconds is the usual target for a hotel. The right target for an apartment building depends on its size and who lives there.
It shows which changes, such as destination control or faster Lifts, would help most.
LML Lift Consultants carries out traffic analysis and prepares Lift specifications for new buildings and modernisations.
Talk to us about your project or call 1300 001 565.
We sell no equipment and take no commissions. Tell us about your building and a consultant will come back to you.